Infrastructure
Add up the real power (watts) of the equipment, add headroom, and pick a UPS whose watt rating covers it. Then choose runtime: how long the load must run on battery. Watts equal VA multiplied by the power factor, so check both ratings in the datasheet.
Revised 2026-10-10. Published by Novatelia. No individual author is named, because no personal credential is claimed for this explanation.
Key points
- Size on watts, and check VA as well.
- Runtime depends on load and battery capacity.
- Topology affects how clean the output power is.
Definition
A UPS keeps equipment running on battery when mains power fails and conditions the power while mains is present. Common topologies are standby, line-interactive and online double-conversion.
How it works
List each device and its power draw in watts from the datasheet or measured values. Add them and keep headroom; many designs keep the UPS at about 70?80% of its rated load as a planning assumption. Use the manufacturer runtime chart for the chosen load to pick battery modules. Check input and output connections and whether the UPS needs network management.
Architecture
- UPS with internal or external batteries.
- Power distribution to the rack (PDUs).
- Network management card for shutdown and alerts.
Use cases
- A network closet with switches and a firewall.
- A server rack that must shut down cleanly.
- A site with frequent short power interruptions.
Comparison
- Line-interactive
- Regulates voltage and switches to battery on failure; common for closets.
- Online double-conversion
- Feeds the load continuously from the inverter; common for servers and sensitive loads.
Selection guidance
- Use measured or datasheet watts, not nameplate maximum only.
- Size runtime for a clean shutdown or for generator start.
- Check battery replacement access and lifetime.
- Plan the PDU and outlet types.
Questions
What is the difference between VA and watts?
VA is apparent power and watts are real power. Watts = VA ? power factor. A UPS has a limit for both, so the load must stay within each.
How long will a UPS run?
It depends on the load and the batteries. Use the manufacturer runtime chart; runtime falls as the load rises.
Related
More in Infrastructure
This page defines a term so a project can be scoped. It is not a certification, a test result, or a price. Partnerships are stated only on the partners page. The published address and telephone are the company contact, not a service-level commitment.
Describe the requirement
An RFQ saves a browser draft. It does not publish a price or issue a quotation reference.

